Floor tiles removedNew fire rated plasterboard fixedKitchen installationCorner unit closeupBoiler before being boxed inNew boilerCompleted KitchenCompleted KitchenCompleted KitchenCompleted Kitchen
Kitchen Refurbishment: Winchmore Hill, N21

Kitchen Refurbishment: Winchmore Hill, N21

This kitchen in winchmoore hill was over 20years old and had to be completely renovated.

The kitchen was completely gutted. The ceiling was pulled down and loose plaster was hacked off ready for the electrician to wire the lighting and install new sockets and spurs. A fire rated plasterboard was fixed to the ceiling. All the walls and ceilings were plastered and the floor was levelled out with a self levelling compound.

Wittick’s kitchen fitters installed the kitchen as directed in the plans. Tiles were applied to the splash back and floor. The walls and ceiling were decorated.

Wittick’s Gas Safe registered gas engineer serviced the existing boiler and appliances, after a few repairs and a thougroh check the client was issued a Gas Safe certificate.